Section Navigation
-
About ACC
- Accreditation
- Locations
- College Leadership
- Social Equity and Belonging Council
- ACC Vision - Strategic Plan
- Employment at ACC
- Faculty & Staff Directory
- Institutional Research
-
Policies & Procedures
- AP 0-01 ACC Procedure Process
- AP 1-40 Academic Freedom
- AP 2-01 Shared Governance Structure
- AP 3-10 Employment Selection Procedure
- AP 3-10a Employment Standards Faculty Instructors
- AP 3-10b Employment Practices for Instructors
- AP 3-20 Due Process Faculty
- AP 3-20C - Issuance and Termination of Faculty Contracts
- AP 3-31 Evaluation Faculty Job Performance
- AP 3-31a Evaluation Administrative Professional And Technical Staff
- AP 3-44 Faculty Professional Development Award
- AP 3-45 Administrative, Professional and Technical Salary Plan
- AP 3-55 Faculty Salary Plan
- AP 3-60 Transitional Retirement Program
- AP 3-80 Faculty Rights Responsibilities And Workload
- AP 3-81 Chairs Rights And Responsibilities
- AP 3-125g Web It Accessibility Plan
- AP 3-150 Employee Code Conduct
- AP 3-160 Travel and Relocation Assistance for Finalists and New Hires
- AP 4-25 Tuition Classification Appeal
- AP 9-09 Requirements for Certificates and Degrees
- AP 9-30 Curriculum Development
- AP 9-47 Instructional Program Review
- AP 10-10b Social Media Accounts
- AP 10-20 Open Records Request
- AP 16-60a Protocol for Non-Commercial Expressive Activity on Campus by the General Public
- AP 16-60b Protocol for Vending and Solicitation on Campus
- AP 16-60c Protocol for Posting and Bulletin Boards on Campus
- AP 19-30a Tobacco and Smoke Free Campus
- AP 19-40a Campus-Wide Epinephrine Auto-Injector Procedure
- Accessibility Statement and Issue Reporting
- Classified Leave Sharing Program
- Foundation
- Visit ACC
- Contact
2020-078M19 Replace HVAC Primary Equipment, Main Building
Arapahoe Community College is replacing its existing cooling tower with possible relocation, located in the Main bldg. at 5900 S. South Santa Fe Drive, Littleton CO 80120. The scope of work includes, replacing the existing cooling tower, condensing water pump and associated piping and addition of sump tank, and replacing the existing free-cooling (water-side economizer) plate-and-frame heat exchanger. The scope also includes replacing the temperature controls associated with the new equipment and adding new lighting in the cooling tower room.